Terms and Conditions

1. General Provisions (Applicable to All Engagements)

1.1 Validity of Quotation
The Subcontractor’s quotation shall remain valid for thirty (30) days from the date of issue. Thereafter, rates may be subject to review.

1.2 Programme
The Subcontractor shall provide sufficient resources to meet the Contractor’s programme and shall comply with all site attendance requirements.

1.3 Health & Safety
The Subcontractor shall comply with all applicable health and safety legislation, including the Construction (Design and Management) Regulations 2015 (UK) or local equivalents.
Risk Assessments and Method Statements (RAMS) shall be submitted before commencement.
All operatives shall attend site inductions and wear appropriate PPE.

1.4 Insurance
The Subcontractor shall maintain Employer’s Liability insurance in all cases.
Where materials are supplied, Public Liability and Product Liability insurance shall also be maintained.
Where design responsibility is undertaken, Professional Indemnity insurance shall be maintained.
Evidence of insurance shall be provided before commencement.

1.5 Payment Terms
Payments shall be made against agreed daywork rates, measured works, or milestone achievements.
Retention shall be limited to three percent (3%) of the gross value of the works, of which one-half (1.5%) shall be released upon completion of the subcontract works and the balance (1.5%) upon practical completion of the project.

1.6 Variations
No variations shall be undertaken without written instruction from the Contractor.
Valuation of variations shall be based on agreed rates or daywork schedules.

1.7 Termination
The Contractor may terminate the engagement for poor workmanship, breach of safety, or insolvency.
The Subcontractor may terminate for non-payment beyond the agreed terms.

1.8 Dispute Resolution
Disputes shall be resolved initially at site level, then escalated to senior management.
If unresolved, disputes shall be referred to adjudication or arbitration in accordance with the Housing Grants, Construction and Regeneration Act 1996 (UK) or local equivalent.

2. Labour-Only Engagement

2.1 Scope of Works
The Subcontractor shall provide skilled labour for the installation of external façade and roofing systems.
All materials, plant, scaffolding, and fixings shall be supplied by the Contractor.

2.2 Workmanship
All operatives shall be competent and experienced.
Works shall be executed in accordance with the Contractor’s method statements, the manufacturer’s installation guides, and relevant regulations.
The Contractor has the right to reject operatives deemed unsuitable.
The Subcontractor has the right to reject any materials that may compromise the integrity of the installation.

2.3 Supervision
The Subcontractor shall provide a foreman or chargehand where required.
Daywork sheets issued by the Subcontractor shall be signed daily by the Contractor’s site management team.

2.4 Insurance
The Subcontractor shall maintain Employer’s Liability insurance covering all operatives engaged on the works.

3. Supply & Fix Engagement

3.1 Scope of Works
The Subcontractor shall provide labour, materials, and fixings to complete the works in accordance with the issued drawings and specifications.

3.2 Materials
All materials supplied shall be new, fit for purpose, and approved by the Contractor.
Installation shall comply with CWCT standards, Building Regulations, and the manufacturer’s instructions.

3.3 Quality Assurance
The Contractor reserves the right to reject defective materials or workmanship.
The Subcontractor shall provide warranties, test certificates, and other compliance documentation as required.

3.4 Insurance
The Subcontractor shall maintain Employer’s Liability, Public Liability, and Product Liability insurance.

4. Design & Build Engagement

4.1 Scope of Works
The Subcontractor shall provide labour, materials, and full design services for the external façade and roofing systems.

4.2 Design Responsibility
The Subcontractor shall prepare and submit design drawings, supporting calculations, and material samples for approval.
All designs must conform to Building Regulations, CWCT standards, applicable fire performance criteria, and relevant manufacturer guidelines.

4.3 Professional Indemnity
The Subcontractor shall maintain Professional Indemnity insurance to cover design liability.

4.4 Quality Assurance
The Subcontractor shall provide QA documentation, warranties, and test certificates to demonstrate compliance with the approved design.

4.5 Insurance
The Subcontractor shall maintain Employer’s Liability, Public Liability, Product Liability, and Professional Indemnity insurance.