Birmingham, Aston Hall Road, B6 7LB
2016
Stancold
Start installing ceiling panels, using a large 17m telehandler with a suction lifter attached via some long straps to lift panels onto top of steels. Guys worked between steels in scaffold towers to fix them down and to move them into position. Once all available panels were in via telehandler, we moved onto ground floor walls whilst nets are fitted to u/s of remaining open roof and hand rail edge protection to open edges of ceiling. Once nets/handrail in place – moved back onto ceiling install, installed like a roof (working from existing panels as working platform and hand-balling the rest of panels into position). Complete trimming works to ceiling – inc. patching around steel penetrations.
12 cladders