Energy Recovery Facility – Beddington Croydon

  • Home
  • Energy Recovery Facility – Beddington Croydon
Location

105 Beddington Lane, Croydon, Surray, CR0 4TD

Duration

From 18.06.2018 - Till 25.03.2019

Contractor

Lagan Group, Barrier Architeсtural

Works accomplished

Project- Energy Recovery Facility - Beddington Croydon. REBUILD Zinc panels system 5000m2 - including (liners panels, bars with brackets, insulation, plywood, membrane and zinc panels) ...VEIO panels system 5000m2 - including (liners panels, bars with brackets, insulation, VEIO panels) ......Aluminium MESH panels 1000m2 - (with brackets fixed to still) .... Aluminium Copings 900L/m.......Aluminium Flashings and corners 700 L/m....Sandwich panels (2000m2)

Workers involved

20 cladders