Energy Recovery Facility – Beddington Croydon

Project

Location

105 Beddington Lane, Croydon, Surray, CR0 4TD

Duration

From 18.06.2018 – Till 25.03.2019

Contractor

Lagan Group, Barrier Architeсtural

Work Accomplished

Project- Energy Recovery Facility – Beddington Croydon. REBUILD Zinc panels system 5000m2 – including (liners panels, bars with brackets, insulation, plywood, membrane and zinc panels) …VEIO panels system 5000m2 – including (liners panels, bars with brackets, insulation, VEIO panels) ……Aluminium MESH panels 1000m2 – (with brackets fixed to still) …. Aluminium Copings 900L/m…….Aluminium Flashings and corners 700 L/m….Sandwich panels (2000m2)

Workers Involved

20 cladders

Other Projects

West Drayton Home Bargains

West Drayton Home Bargains

ProjectWest Drayton2024Sandwich Panels Copings and Flashing[dnxte_masonary dnxte_columns="2" dnxte_columns_tablet="2" dnxte_columns_phone="1" dnxte_columns_last_edited="on|phone" _builder_version="4.27.4" _module_preset="default" hover_enabled="0"...

Stone Cladding Birmingham

Stone Cladding Birmingham

ProjectBirmingham[dnxte_masonary dnxte_columns="2" dnxte_columns_tablet="2" dnxte_columns_phone="1" dnxte_columns_last_edited="on|phone" _builder_version="4.27.4" _module_preset="default" hover_enabled="0" global_colors_info="{}" gallery_ids="255665,255664"...